Skip to page content

Worldwide (English) Change

Contents   Fixed field   0xx   1xx   2xx   3xx   4xx   5xx   6xx   7xx   8xx   9xx

263  Projected Publication Date (NR)

Input Standards

LC, NLC, UKM, NLM use only//LC, NLC, UKM, NLM use only
1st Indicator  Undefined
blank character  Undefined
2nd Indicator  Undefined
blank character  Undefined
Subfields (R=Repeatable  NR=Nonrepeatable) Input Standards
a Projected publication date (NR) Mandatory/Mandatory


Definition

The projected date of publication for Cataloging-in-Publication (CIP) and National Serials Data Program (NSDP) records. Such advance information comes from the publisher.

1st Indicator

Undefined. The 1st indicator position is undefined and contains a blank (blank character ).
blank character Undefined

2nd Indicator

Undefined. The 2nd indicator position is undefined and contains a blank (blank character ).
blank character Undefined

Subfields

a Projected publication date

The date is in the form yyyymm. For example, if a projected date is December 2001, the field is 200112. For a projected date of 2004 (month unknown) the date is
2004--.

A projected date of 1111 indicates receipt and initial processing of the item by the Library of Congress (LC).

LC reissues CIP records with corrected dates if a publisher delays publication and LC obtains a revised date from the publisher.

If LC cannot obtain the item after publication, LC changes the date to four hyphens.

Printing

Field 263 does not print.

back to top